Professional installation of KMEW facades

Manuals, fixing system, accessories and technical support to install Filltect and Ceradir V correctly.
See the assembly system
Professional installation of KMEW facades

Assembly system

Substrate, subframe, ventilation cavity and panel work together. The sequence below is the order of work on site.
Ventilated facade system: substrate, subframe, cavity and KMEW panel
01
Substrate and subframe
Plumb · alignment · geometry
02
Setting out
Modulation · openings · corners
03
Starter
Starter profile · air inlet
04
Clips and panels
Installation sequence
05
Junctions and trims
Openings · corners · coping · base
06
Final check
Alignment · cleaning
Vertical rails on brackets, brick wall with insulation
Horizontal and vertical rails, block wall with insulation
Corner section: wall, insulation, subframe and KMEW panel

The same installation process

FILLTECT and CERADIR V are installed following the same logic and the same sequence of work. For the installer the process is practically the same; only certain clips, accessories and series-specific requirements change.
FILLTECT CERADIR V
Main focus Design and architectural expression Height, light weight and refurbishment
Thickness 16 mm 14 mm
Format 3030 × 455 mm 3000 × 455 mm
Weight per m² 18,12 kg/m² 14,65 kg/m²
Surface technology Photocatalytic ceramic coating Hydrophilic coating

System and accessories

Starter profile
First row
Fixing clip
Concealed fixing
Joiner
System joints
Trims
Corners and openings
Subframe
Aluminium / steel
Fasteners
According to the substrate, the subframe and the project calculation

Cutting and preparation

Panels are cut and adjusted on site when the setting out requires it. The general recommendations below apply to installation work; the specific dimensions, spacings and requirements are in the current manual.
  • Tools and cutting method as set out in the current manual
  • Dust extraction and personal protective equipment
  • Storage and handling of the panel on site
  • Edge and trim treatment according to the series, the detail and the current manual
Cutting disc for KMEW panels
Square for marking and guiding the cut
Cutting station on site: panels on trestles, saw and dust extraction
Cut made with the disc for KMEW panels: clean edge and a tight joint.
Cut made with the disc for KMEW panels: clean edge and a tight joint.
Cut made with an unsuitable disc: chipped edge and the core showing along the joint.
Cut made with an unsuitable disc: chipped edge and the core showing along the joint.

Mechanical fixing on site

KMEW
Mechanical fixing
  • No drying times for the cladding
  • More predictable work sequence
  • Less wet waste on site
  • Panel + clip + subframe
  • Less dependence on drying processes
Fixing clip on the subframe holding the edge of the panel

Installation is still subject to safety, wind, heavy rain, ice, access and storage. The real advantage is that the cladding does not need to cure or dry wet layers before work can continue.

Final quality check

Final check before handover. The acceptance criteria are those of the project and of the current manual.
  • Plumb and alignment of the subframe
  • Ventilation cavity clear and continuous
  • Joints and spacings in accordance with the current manual
  • Junctions and trims correctly executed
  • Fixings complete and panels without visible damage
  • Final cleaning of the facade
Checking the installed facade before handover

Technical installation enquiry

If in doubt about the installation, send the detail before carrying out a solution on site.
Useful documentation for the enquiry:
  • Photographs of the junction or detail
  • Sketch, PDF or drawing
  • Panel series and reference
  • Type of subframe
  • Short description of the enquiry
Privacy

The files are used solely to study the enquiry and prepare the technical and commercial response.

Privacy Policy
Send technical enquiry

    What do you need?

      Request a call