Professional installation of KMEW facades
Manuals, fixing system, accessories and technical support to install Filltect and Ceradir V correctly.
See the assembly system
Assembly system
Substrate, subframe, ventilation cavity and panel work together. The sequence below is the order of work on site.
01
Substrate and subframe
Plumb · alignment · geometry
02
Setting out
Modulation · openings · corners
03
Starter
Starter profile · air inlet
04
Clips and panels
Installation sequence
05
Junctions and trims
Openings · corners · coping · base
06
Final check
Alignment · cleaning
Technical Documentation
Manual
Aluminium subframe
Filltect / Ceradir V
Open
Manual
Steel subframe
Filltect / Ceradir V
Open
ETA
Filltect
European Technical Assessment
Consult
ETA
Ceradir V14
European Technical Assessment
Consult
EPD
European families
Environmental declaration
Consult
Details
Available details
Available solutions
Request
The same installation process
FILLTECT and CERADIR V are installed following the same logic and the same sequence of work. For the installer the process is practically the same; only certain clips, accessories and series-specific requirements change.
| FILLTECT | CERADIR V | |
|---|---|---|
| Main focus | Design and architectural expression | Height, light weight and refurbishment |
| Thickness | 16 mm | 14 mm |
| Format | 3030 × 455 mm | 3000 × 455 mm |
| Weight per m² | 18,12 kg/m² | 14,65 kg/m² |
| Surface technology | Photocatalytic ceramic coating | Hydrophilic coating |
System and accessories
Starter profile
First row
Fixing clip
Concealed fixing
Joiner
System joints
Trims
Corners and openings
Subframe
Aluminium / steel
Fasteners
According to the substrate, the subframe and the project calculation
Cutting and preparation
Panels are cut and adjusted on site when the setting out requires it. The general recommendations below apply to installation work; the specific dimensions, spacings and requirements are in the current manual.
- Tools and cutting method as set out in the current manual
- Dust extraction and personal protective equipment
- Storage and handling of the panel on site
- Edge and trim treatment according to the series, the detail and the current manual
Junctions and details
Send the construction detail of your project and we will identify the applicable KMEW solution.
Mechanical fixing on site
KMEW
Mechanical fixing
- No drying times for the cladding
- More predictable work sequence
- Less wet waste on site
- Panel + clip + subframe
- Less dependence on drying processes
Installation is still subject to safety, wind, heavy rain, ice, access and storage. The real advantage is that the cladding does not need to cure or dry wet layers before work can continue.
Final quality check
Final check before handover. The acceptance criteria are those of the project and of the current manual.
- Plumb and alignment of the subframe
- Ventilation cavity clear and continuous
- Joints and spacings in accordance with the current manual
- Junctions and trims correctly executed
- Fixings complete and panels without visible damage
- Final cleaning of the facade
Technical installation enquiry
If in doubt about the installation, send the detail before carrying out a solution on site.
Useful documentation for the enquiry:
- Photographs of the junction or detail
- Sketch, PDF or drawing
- Panel series and reference
- Type of subframe
- Short description of the enquiry
Privacy
The files are used solely to study the enquiry and prepare the technical and commercial response.
Privacy PolicySend technical enquiry
Español
English